Rajasthan Integrated Cluster Development Scheme (2024)
.
🕒 Duration
- Effective until: 31st March 2029
🎯 Objectives
- Enhance competitiveness, productivity, and quality of MSME, Handloom, and Handicraft sectors.
- Upgrade infrastructure and establish Common Facility Centers (CFCs).
- Provide access to raw material, skill development, and e-commerce marketing.
- Support participation in Central Government schemes.
- Promote export growth and market development.
🧱 STRUCTURE OF THE POLICY
I. Support to Artisan/Craftsman/Weaver Clusters
A. Soft Interventions (100% State Grant)
- Max grant: ₹50 Lakhs per cluster.
- Coverage: Skill dev., market exposure, product design, GI tagging, branding, SPV formation.
- Implementation Time: 18 months.
- Follow-up Reports: At 6 months and 1 year post-project.
B. Raw Material Bank Support
- Loan Amount: Up to ₹50 Lakhs soft loan.
- Interest Subsidy: 8% reimbursement on term loan.
- Limit: Max 10 clusters.
- Eligibility: SPV with infrastructure (own/long-term lease), minimum road width (40 ft urban), sales at below-market prices, inclusive structure.
C. E-Commerce Marketing Incentive
- Incentive: 20% of online annual sales, up to ₹50,000 per artisan.
- Eligibility: Artisan with ID card, new to e-commerce, minimum ₹1 Lakh online turnover.
- Application through: GM DICC.
- Audit and documentation required for disbursement.
II. Support to MSME Clusters for Common Facility Centers (CFCs)
A. State Assistance for CFCs (Cap: ₹10 Cr/project)
- Grant Share:
- 80% of project cost (max ₹10 Cr).
- 90% for SC/ST/Women-owned/ODOP enterprises.
- Funding Partners: State Govt. + RIICO (equal grant sharing).
- Facilities Covered:
- Testing labs, packaging, training centers, recycling, logistics, biogas, Industry 4.0 labs, etc.
- SPV Requirements:
- Minimum 10 MSEs with Udyam Registration.
- SPV to contribute 10–20%, inclusive model.
B. Support to Access Central Govt. CFC Schemes
- Assistance with application, approvals, and technical consultancy.
III. Infrastructure Development Support
A. For Existing Clusters (non-RIICO areas)
- Max project cost eligible: ₹10 Cr.
- State Grant: Up to ₹8 Cr (80% of total).
- Facilities: Roads, drainage, water, electricity, gas, sewage, etc.
- SPV required: Registered entity owning/authorized to develop land.
B. For Greenfield Clusters (non-RIICO areas)
- Min Area: 10 acres.
- Project Cost Ceiling for Grant: ₹10 Cr.
- State Grant:
- 50% (Developed districts)
- 60% (Other districts)
- Max Grant: ₹5 Cr
- Eligibility:
- IA/SPV must bring 20% contribution.
- Lease land for 30+ years.
- At least 80% area reserved for micro/small units.
- Not more than 2 approvals per entity.
- Facilities: Site development, boundary wall, CETP, warehouse, etc.
IV. Special Incentives
-
Concessional Land Allotment
- RIICO Allotment @ 25% of industrial rate for CFCs.
-
Assistance for Exposure Visits
- Grant: Up to ₹2 Lakhs per cluster for study/exposure visits outside Rajasthan.
- Must be approved by Commissioner, Industries & Commerce.
📋 Project Governance and Monitoring
🧑💼 Project Approval Committee (PAC)
- Headed by Commissioner, Industries & Commerce.
- Includes Finance Dept, RIICO, GM DICCs, and others.
🏗 Implementing Agencies
- Preference to government/PPP agencies.
- In absence, NGOs/consultants selected via EoI.
- SPVs must have inclusive structure and minimum members.
📊 Monitoring
- District Level Monitoring Committees review quarterly progress.
- Utilization Certificates, CA audits, and physical inspections mandatory.
🔄 Grant Disbursement Schedule
Component | 1st Installment | 2nd Installment | Final Installment |
---|---|---|---|
Soft Interventions | 25% advance | Post UC submission | 10% on completion |
CFCs | 50% | 40% | 10% |
Infra (Existing/Greenfield) | 50% | 40% | 10% (Reimbursement) |
🔍 Key Figures Summary
Feature | Value |
---|---|
Duration | Till 31 March 2029 |
Max Grant for Artisan Soft Interventions | ₹50 Lakhs |
Max Soft Loan for Raw Material Bank | ₹50 Lakhs |
E-commerce Sale Incentive | 20% up to ₹50,000 |
Max Grant for CFCs | ₹10 Cr |
Max Projects for Raw Material Bank | 10 |
Max Grant for Infra Dev. Existing Cluster | ₹8 Cr |
Max Grant for Infra Dev. Greenfield | ₹5 Cr |
Max Greenfield Projects | 5 |
Land Allotment Discount (RIICO) | 75% |
Grant Share for SC/ST/Women SPV | 90% |