State's First Signature Bridge on Badrinath Highway
Aspect | Details |
---|---|
Event | Construction of Uttarakhand's first signature bridge on Badrinath Highway. |
Location | Narkota on Rishikesh-Badrinath Highway. |
Announcement Date | December 3, 2023. |
Announced By | Tanuj Kambuj, Executive Engineer, National Highway Construction Division. |
Bridge Type | Curved motor bridge (first of its kind in Uttarakhand). |
Bridge Length | 110 meters. |
Project Cost | Rs 64 crore. |
Project Under | All Weather Road Project. |
Safety Features | Safety cables on both sides and upper side. |
Expected Completion | May 2024. |
Main Attraction | Unique design of the signature bridge. |